Construction on coal-fired power plant passes halfway point

ST. PAUL, Va. -- The steel structure is almost complete for the 20-story boiler building at the Virginia City Hybrid Energy Center, the 585-megawatt coal-fired power plant under construction and on target to be operational in 2012. With the ongoing clank